We use cookies to keep you signed in and to see what's working and what breaks. No advertising cookies, nothing sold. Details in our Cookie Policy.

Trade Playbook

What sheet metal workers make in Ontario

Sheet metal splits two ways people don't expect — the shop and the field, and HVAC ducting versus architectural metal. The questions follow: shop fabrication or field install, duct work or custom cladding, union (SMART) or not, and whether to chase the detailing/CAD side off the tools. It's a precision trade hiding inside a dirty one.

Where it starts

A % of journeyperson rate

Apprentice

Where it tops out

Business income

Sheet metal / HVAC contractor

Union route

SMART locals

Pay by stage

Ontario figures for sheet metal work, from the first day on site to the top of the trade. Approximate, and worth checking against current collective agreement rates and job postings in your region.

StagePayWhat is going on at this stage
ApprenticeA % of journeyperson rateClimbing each level through the 308A apprenticeship.
Journeyperson (308A)$32–45/hrSMART union sits at the top with a pension.
Shop / field foremanMore
Detailer / CADStrong, off the toolsThe drafting/layout side — a well-paid escape from field work.
Sheet metal / HVAC contractorBusiness income

The wage is not the rate

Every figure above is what sheet metal workers get paid. It is not what you charge once you run a sheet metal business. Your rate has to carry the hours you are not on the tools, the truck, the tools themselves, WSIB, insurance, the quote you wrote and lost, and the holdback sitting in someone else's account for 60 days. Contractors who set their rate off their old hourly wage are the ones who work every weekend and still cannot say whether the year was profitable.

The step from paid by the hour to paid by the job

Where the money goes after the tools

The standout off-tools move is detailing/CAD — sheet metal detailers who can model duct and coordinate in BIM are well paid and out of the weather. Beyond that: estimating, shop or field foreman, superintendent, or owning a sheet metal/HVAC business. The fabrication-and-layout brain transfers straight into the design side.

What sets the rate

Licence to do the work
Required — 308A C of Q (compulsory); 308R for residential
Path in
Apprenticeship — about 5 years for 308A
Union route
SMART locals

Check the numbers yourself

Wage data, union rate sheets, and the places sheet metal workers talk about money openly.

Who is paying it right now

The rates above are the market. The live feed is the market this week: which builders and contractors just pulled a permit or won a contract in Ontario, what they are about to need, and who to call.

HVAC, Refrigeration and Mechanical Jobs in Ontario: Who Is Hiring

Keep going

The year you go out on your own is the year the paperwork doubles

AEC Stack handles incorporation, WSIB, insurance certificates, quoting, invoicing, and chasing the money, so a sheet metal business runs like one with an office behind it.

Start your business