We use cookies to keep you signed in and to see what's working and what breaks. No advertising cookies, nothing sold. Details in our Cookie Policy.

Going out on your own

How to start a solar installation business in Ontario

Solar PV businesses design and install rooftop and ground-mount systems — riding net-metering, rising power prices, and battery storage. It is an electrical contracting business with an extra layer nobody else has: utility interconnection.

Solar PV Installation at a glance

Licence to do the work
Electrical work requires 309A + ECRA/ESA contractor; racking does not
Path in
Electrician route, or racking/installer route alongside a licensed partner
Regulated by
ESA (permits, connections) + utility (net metering)
Insurance baseline
$2M+ CGL — roof penetrations + Working at Heights
Union route
IBEW on utility-scale work

Solar PV Installation is a compulsory trade in Ontario. You cannot legally do this work, or hire people to, without the required certification. This is the key difference from non-compulsory trades and the first thing to sort out.

The steps to start your solar installation business

  1. 1

    Incorporate your company

    Most contractors incorporate (Ontario or federal) to limit personal liability, look credible to larger clients, and access tax advantages once profitable. You choose a named or numbered company, set directors and share structure, and file the articles. Budget roughly $400–$600.

    Full guide: Incorporation
  2. 2

    Register your CRA accounts

    Get a Business Number, then register for HST/GST (mandatory once you exceed $30,000 in revenue, and worth registering sooner to claim input tax credits), a payroll account if you will hire, and corporate income tax. This is free and done through the CRA.

    Full guide: CRA Registration
  3. 3

    Register for WSIB

    Construction is a mandatory WSIB sector. Independent operators and partners in construction generally must register even with no employees, and clients and general contractors will require a valid WSIB clearance certificate before letting you on site.

    Full guide: WSIB & Provincial
  4. 4

    Get certified and licensed for solar pv installation

    Solar electrical work runs through the standard gate — licensed electricians under an ECRA/ESA contractor licence, with ESA permits and inspection — plus the solar-specific layer: utility interconnection (net-metering applications with Hydro One or the local utility), structural/racking considerations on roofs, and Working at Heights. CSA-certified equipment and, increasingly, battery-storage rules round it out.

    Full guide: Trade Licensing
  5. 5

    Get insured

    Carry Commercial General Liability (typically $2M, $5M for commercial/industrial work), plus tools and equipment, commercial auto, and — depending on scope — builders risk and professional liability. Many contracts and clients specify minimum coverage before you can quote.

    Full guide: Insurance
  6. 6

    Set up health, safety & compliance

    Meet your Occupational Health and Safety Act duties: a health and safety policy, required training (WHMIS, Working at Heights where applicable), and — for commercial and public work — often COR® certification. This is also where any trade-specific safety tickets live.

    Full guide: Safety Compliance
  7. 7

    Stand up your operations

    Open business banking, set up construction-specific accounting, and understand your trust obligations under the Construction Act (holdback, prompt payment, and adjudication). This is the back office that keeps you paid and out of trouble.

    Full guide: Operational Setup
  8. 8

    Get bid-ready and win work

    Assemble your prequalification package — incorporation and WSIB documents, insurance and bonding letters, safety program, key personnel, and project references — then quote, send proposals, and collect on invoices. This is where a construction business actually makes money.

    Full guide: Bid Readiness

Insurance for a solar installation business

Roof work plus electrical plus the client's home: carry $2M+ CGL, confirm coverage for roof penetrations and water intrusion, and keep Working at Heights current.

Your launch checklist

The whole page in one list. Screenshot it, stick it on the dash of the truck.

  • Incorporate your company
  • Register your CRA accounts
  • Register for WSIB
  • Get certified and licensed for solar pv installation
  • Get insured
  • Set up health, safety & compliance
  • Stand up your operations
  • Get bid-ready and win work

Skip the paperwork. Let AEC Stack set it up

AEC Stack runs the whole process for a solar installation business: incorporation, CRA, WSIB, trade licensing, insurance, compliance, and the operations to win your first contract.

Start your solar pv installation business