De facto standardPaywalledFourth edition
Institution of Civil Engineers / Emerald (formerly Thomas Telford)
civil engineering measurementcivils bill of quantities structureitem coding for civil works
Measuring civils work to NRM2 produces a bill a civils QS will not recognise. Method-Related Charges in particular are the civils analogue of the fixed/time-related preliminaries split and have no counterpart in the building rules.
De facto standardFree to read
National Highways (Manual of Contract Documents for Highway Works, Volume 4)
highway works measurementhighway bill of quantities structureSeries-based work classification
Free and downloadable, so its structure can be relied on directly. Any National Highways or local highway authority scheme will expect this, not NRM2.
De facto standardPaywalled
RICS
order of cost estimatingcost planningelemental breakdownGIFA measurement
De facto standardPaywalled
RICS
detailed measurementbill of quantitieswork section structureitem descriptions
Common practicePaywalled3rd edition, operative from 1 September 2007
RICS with the Construction Confederation
prime cost of daywork labour, materials and plantstandard hourly base rate compositionpercentage addition versus all-inclusive rate options
Common practicePaywalled
RICS
maintenance works measurementlife cycle cost planning
Extends the NRM suite past practical completion. Relevant when a client asks for whole-life cost, not capital cost.
LegacyPaywalled7th
RICS
detailed measurement (legacy)bill of quantities (legacy)
Kept in the directory deliberately: an agent that meets an SMM7 citation in a historic bill must recognise it rather than treat it as a typo.