Code compliance on the UK construction

The codes a design has to satisfy and the bodies that publish and amend them.

6 authorities, 5 statutory, 5 free to read.

StatutoryFree to read

Building Safety Act 2022, with the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 (SI 2023/909) and the Building Regulations etc. (Amendment) (England) Regulations 2023 (SI 2023/911)

UK Parliament and MHCLG (legislation.gov.uk, gov.uk, HSE Building Safety Regulator)

higher-risk building definitiongateway approvalsgolden threadmandatory occurrence reportingdutyholder competencebuilding safety levy

Load-bearing for any residential work above 18m and increasingly for competence and duty-holder requirements on all buildings. The gateways are hard stops, which makes them programme risks rather than approvals.

StatutoryFree to read

Party Wall etc. Act 1996

UK Parliament / MHCLG

party structure noticesline of junction noticesadjacent excavation noticessurveyor awards

On any urban infill or basement job these notice periods control the start date, and they are commonly discovered after the programme has been issued.

StatutoryFree to read

Town and Country Planning Act 1990 (including Schedule 7A inserted by the Environment Act 2021), Community Infrastructure Levy Regulations 2010 as amended, and the statutory biodiversity metric

UK Parliament / MHCLG / Natural England

planning permission and conditionspre-commencement condition dischargeCommunity Infrastructure Levy notices and instalmentssection 106 obligationsbiodiversity net gain condition

These are the consents that most often control a UK start date and they sit outside building control entirely, so a programme built only around building regulations approval will miss them.

De facto standardPaywalled

NHBC Standards

NHBC (with equivalent regimes from LABC Warranty, Premier Guarantee and Checkmate)

structural warranty technical requirements for new homesfoundation, superstructure and drainage detailingwarranty inspection regime

UK new homes are effectively unsaleable and unmortgageable without a warranty, so the warranty provider's standards operate as a second, often stricter, code alongside the Building Regulations.

The rest of the the UK register