Grid compliance issues with inverter-dominated microgrids on hospital sites

We're retrofitting a backup system for a mid-size urban hospital, incorporating 1.8MW of PV, lithium-ion storage, and a synchronous gas generator. The issue? Islanding during brownouts. The utility insists we maintain grid-forming sync on a 3-second failover window, but our inverter stack can't maintain frequency stability without the genset firing immediately. We're exploring adding a flywheel or synchronous condenser but facing cost and space constraints. Anyone built an inverter-dominant microgrid that passed interconnect with similar constraints?
2

Comments (10)

BU
buildpulse_fm2 months ago
From operations: add a soft-sync monitor and alarms on lag, not just system faults. We had two brownout failures simply because no one realized sync loss was drifting by seconds.
CH
chandra.water2 months ago
Don't underestimate ops logistics. One of our clients couldn't service tiedown banks without de-energizing the entire microgrid. Mechanical planning needs to account for maintainability under partial sync.
BI
bim.legend2 months ago
Site constraints matter — we pre-modeled thermal envelopes at LOD-400, just to validate we had physical and thermal space for backup inverters. That planning saved us a costly mid-construction redesign.
HP
hp.consulting2 months ago
You should get utility agreement in writing for any islanding rules. We once met every technical requirement, but still lost bidirectional sync rights due to unclear interconnect policy.
SA
santiago.codes2 months ago
We've modeled thermal drift of inverters during rapid switching — even a 10°C rise changed the frequency stability window. Minor factor, but compounded under load.
AD
adam.infra2 months ago
Genset sizing often gets overlooked. If it's too big, it destabilizes the voltage under partial load. Match your spinning reserve to likely discharge profile, not just peak draw.
BE
benji_ee2 months ago
The transition protocol is everything. We used a firmware-level ramp buffer that mimics frequency droop — allowed our PV to maintain sync long enough for the genset to spool.
IM
imani.amlo2 months ago
Also consider regulatory pushback. Some utilities still treat inverter-only islands as non-compliant by default. We had to submit full EMT simulation runs at a hospital site to prove ride-through stability.
ZO
zoe.assetlife2 months ago
Flywheels sound good on paper, but most FM teams don't have the O&M discipline for them. Consider virtual inertia stacking if your BESS vendor supports it — works well up to 3MW scale.
PO
powerraul2 months ago
We ran into this on a pharma plant — ended up specifying a hybrid inverter with a built-in grid-forming mode that kicks in under 100ms. Not cheap, but eliminated need for a full rotating mass buffer.