We use cookies to keep you signed in and to see what's working and what breaks. No advertising cookies, nothing sold. Details in our Cookie Policy.

Who is hiring

Demolition jobs in Toronto

49 building permits that need demolition contractors were pulled in Toronto, Ontario over the 23 days to August 14, 2026. That is roughly 15 a week. Almost all of it is housing, led by sfd - detached. That is owner-and-builder work, small tickets, fast turnarounds, and it is won on being reachable rather than on being cheapest.

49
building permits pulled
15
new per week
Aug 14, 2026
most recent
Counts cover the 23 days to August 14, 2026.

Live right now in Toronto

545 open
Just pulled a permit

ZEKIEL KAPLAN

No value published
TorontoPermit pulled Aug 14, 2026Demolition / SFD - Detached

Likely scope, estimated

Demolition

Demolition permit at 2 SILVERWOOD AVE, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: ZEKIEL KAPLAN.

Just pulled a permit

LILIA KIRIAKOU

No value published
TorontoPermit pulled Aug 13, 2026Demolition / SFD - Detached

Likely scope, estimated

Demolition

Demolition permit at 12 EDGECROFT RD, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: LILIA KIRIAKOU.

Just pulled a permit

HALO MULTIPLEX 1 GP SERVICES CORP

No value published
TorontoPermit pulled Aug 12, 2026Demolition / SFD - Detached

Likely scope, estimated

Demolition

Demolition permit at 627 MCROBERTS AVE, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: HALO MULTIPLEX 1 GP SERVICES CORP.

Just pulled a permit

42 CARR INC

No value published
TorontoPermit pulled Aug 11, 2026Demolition / SFD - Detached

Likely scope, estimated

Demolition

Demolition permit at 42 CARR ST, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: 42 CARR INC.

What the work actually is

How City of Toronto classified the 49 building permits that name demolition.

Demolition
47(96%)
Addition/Alteration
2(4%)

What is being built

The structure types behind the demolition work. This is the fastest way to tell whether the volume in Toronto is your kind of job.

SFD - Detached
43(88%)
Commercial
4(8%)
Industrial
1(2%)
SFD - Semi-Detached
1(2%)

How to work this list

  • A pulled permit means the money is committed and the schedule is being built. For demolition contractors that is weeks to months of warning before the call goes out.
  • On housing the applicant is usually the owner or a small builder, and there is no bid list to get onto. The whole game is being the first name they have when the trade is needed.
  • Sort by date, take the newest ten, and work them the same week. A permit from three months ago is already covered.

Demolition work in other markets

Other trades hiring in Toronto

Where this comes from. Open building permit records published by City of Toronto. AEC Stack reads them daily, classifies the trades each job will need, and drops the jobs too large for a small contractor to bid.

Win one of these and the rest of it runs itself

Track a job from this page into a pipeline, quote it, and send the invoice when the work is done. Reply to an email from the truck and the invoice goes out. No account needed to start, and everything you do before you sign up stays yours.