We use cookies to keep you signed in and to see what's working and what breaks. No advertising cookies, nothing sold. Details in our Cookie Policy.

Who is hiring

Concrete & Forming jobs in Sacramento

17 permits that need concrete and forming crews were pulled in Sacramento, California over May 29 to July 17, 2026. This is commercial and institutional work, led by commercial. Longer lead times, a general contractor between you and the owner, and a prequalification package expected before anyone talks price. Where a value is published, the median job is $19k and the largest was $90k.

17
permits pulled
$19k
median job value
Jul 17, 2026
most recent
Counts cover May 29 to July 17, 2026.

Who is pulling the concrete and forming permits in Sacramento

Companies with more than one concrete and forming permit in Sacramento in this window. The number is how many carry their name.

  1. Drain Time Inc2 permits
    Plumbinglatest Jun 4median $14k

Drain Time Inc files across three or more trades, which is what running a whole job looks like on the permit record. Those are the names to call about subcontract work.

See the addresses on every one of these permits

Live right now in Sacramento

86 open
Just pulled a permit

CENTRAL BUILDERS INC

$25K
SacramentoPermit pulled Jul 17, 2026Demolition

Likely scope, estimated

Gas Fitting
Fire Protection
Concrete & Forming
Demolition

Demolition permit at 1108 47TH ST, Sacramento. Gas Fitting, Fire Protection, Concrete & Forming trade work estimated at $25,000 USD. Primary party: CENTRAL BUILDERS INC.

Just pulled a permit

ENVISION CONTRACTING INC

$45K
SacramentoPermit pulled Jul 10, 2026Electrical / Industrial

Likely scope, estimated

Electrical
Concrete & Forming
Elevator/Vertical Transportation

Electrical permit at 3331 FRUITRIDGE RD, Sacramento. Electrical, Concrete & Forming, Elevator/Vertical Transportation trade work estimated at $45,000 USD. Structure type: Industrial. Primary party: ENVISION CONTRACTING INC.

Just pulled a permit

MURADU CONSTRUCTION INC

$90K
SacramentoPermit pulled Jul 8, 2026Addition/Alteration

Likely scope, estimated

Roofing
General Contracting
Concrete & Forming

Addition/Alteration permit at 2951 BELDEN ST, Sacramento. Roofing, General Contracting, Concrete & Forming trade work estimated at $90,274 USD. Primary party: MURADU CONSTRUCTION INC.

Just pulled a permit

ATI RESTORATION LLC

$20K
SacramentoPermit pulled Jul 1, 2026General / Semi-Detached/Detached

Likely scope, estimated

Fire Protection
Framing & Carpentry
Concrete & Forming

General permit at 6633 VALLEY HI DR, Sacramento. Fire Protection, Framing & Carpentry, Concrete & Forming trade work estimated at $20,000 USD. Structure type: Semi-Detached/Detached. Primary party: ATI RESTORATION LLC.

What the work actually is

How City of Sacramento classified the 17 permits that name concrete and forming.

General
10(59%)
Addition/Alteration
3(18%)
Demolition
2(12%)
Electrical
1(6%)
Plumbing
1(6%)

What is being built

The structure types behind the concrete and forming work. This is the fastest way to tell whether the volume in Sacramento is your kind of job.

Commercial
3(60%)
Industrial
1(20%)
Semi-Detached/Detached
1(20%)

How to work this list

  • A pulled permit means the money is committed and the schedule is being built. For concrete and forming crews that is weeks to months of warning before the call goes out.
  • On commercial and institutional work you are not selling the owner, you are selling the general contractor who is about to be awarded it. Find the GC, get on the bid list before the tender closes.
  • Have the prequalification package ready before you call: WSIB clearance or the local equivalent, certificate of insurance, safety record, three references in the same building type.

Concrete & Forming work in other markets

Other trades hiring in Sacramento

Where this comes from. Open permit records published by City of Sacramento. AEC Stack reads them daily, classifies the trades each job will need, and drops the jobs too large for a small contractor to bid.

Win one of these and the rest of it runs itself

Track a job from this page into a pipeline, quote it, and send the invoice when the work is done. Reply to an email from the truck and the invoice goes out. No account needed to start, and everything you do before you sign up stays yours.

Get qualified for this work

The licensing and certification route for concrete and forming crews, and who employs them.