Who is hiring
54 building permits that need demolition contractors were pulled in Ontario over the 23 days to August 14, 2026. That is roughly 16 a week. Almost all of it is housing, led by sfd - detached. That is owner-and-builder work, small tickets, fast turnarounds, and it is won on being reachable rather than on being cheapest.
1001575783 ONTARIO INC
Likely scope, estimated
Demolition permit at 52 ALTAMONT RD, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: 1001575783 ONTARIO INC.
JOSE MAGALHAES
Likely scope, estimated
Demolition permit at 145 PENDRITH ST, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: JOSE MAGALHAES.
EDGELY BUILDERS
Likely scope, estimated
Demolition permit at 44 PORTSDOWN RD, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: EDGELY BUILDERS.
YI TIAN
Likely scope, estimated
Demolition permit at 389 HOUNSLOW AVE, Toronto. Demolition trade work. Structure type: SFD - Detached. Primary party: YI TIAN.
How City of Brampton classified the 54 building permits that name demolition.
| Demolition | 52(96%) | |
| Addition/Alteration | 2(4%) |
The structure types behind the demolition work. This is the fastest way to tell whether the volume in Ontario is your kind of job.
| SFD - Detached | 43(86%) | |
| Commercial | 4(8%) | |
| Industrial | 1(2%) | |
| Institutional | 1(2%) | |
| SFD - Semi-Detached | 1(2%) |
Track a job from this page into a pipeline, quote it, and send the invoice when the work is done. Reply to an email from the truck and the invoice goes out. No account needed to start, and everything you do before you sign up stays yours.