Drywall and Plastering Jobs in Ontario: Who Is Hiring
Who hires drywall, acoustic, lathing and plastering trades in Ontario, when board and finishing land in the build, and how to reach the interior-systems contractors.
Drywall & Plaster hiring, live
26 liveNOBLE PRIME SOLUTIONS LTD
Likely scope, estimated
General permit at PLAN 58M-372 PT BLK 2 RP 58R-18030 PT 29, Kitchener. Painting & Finishing trade work estimated at $93,300 CAD. Primary party: NAVPREET KAUR :NOBLE PRIME SOLUTIONS LTD.
VIN ENGINEERING INC
Likely scope, estimated
General permit at PLAN 1489 PT LOT 32 RP 58R-5097 PT PART 1 RP 58R-7452 PARTS 1 AND 2 AND RP 58R-14797 PART 1 AND EXP WR1152266 PLAN PART 4, Kitchener. Painting & Finishing trade work estimated at $200,000 CAD. Structure type: Institutional. Primary party: SUNIL SHAH :VIN ENGINEERING INC.
DEANNA PAPP
Likely scope, estimated
General permit at PLAN 269 PT LOT 7 PT LOT 9 PT LOT 10, Kitchener. Painting & Finishing trade work estimated at $28,600 CAD. Primary party: DEANNA PAPP.
Demolition~Jul-Sep 2026
Plumbing~Aug 2026 to Jan 2027
GERRARD'S DESIGN AND DRAFTING
Likely scope, estimated
Addition/Alteration permit at PLAN 1063 LOT 14 PT LOT 15, Kitchener. General Contracting, Painting & Finishing trade work. Primary party: JIM GERRARD :GERRARD'S DESIGN AND DRAFTING.
Live building permits and contract awards, not confirmed job postings. Scope and timing are estimates. Confirm with the employer.
Ontario builds a lot of walls and ceilings, and almost none of them close up without a drywall crew. Every office fit-out, every school and hospital, every retail build, every condo tower and house reaches a point where the walls are ready to cover, and someone has to frame the steel stud, hang the board, tape it, sand it, and hand it off to the painters. Two related but distinct tickets carry that work: the 451A drywall, acoustic and lathing applicator (the boarder, who frames and hangs) and the 453A drywall finisher and plasterer (the taper, who tapes, muds, sands, and plasters). Both are in demand, and the demand is spread across the whole province. The hard part is not whether the work exists. The hard part is knowing which interior contractor just won a job and needs boarders or tapers, and getting your name in before the crew is full.
That is what this page is for. The live strip above pulls the employers who just pulled a building permit or won a contract that will need interior finishing, so you can chase real, current jobs instead of scrolling stale job boards. Below is the operator-level read on who hires drywall and plastering trades in Ontario, when they need you on site, and how to actually reach them.
Who hires drywall and plastering trades in Ontario
Boarding and finishing get subbed out far more often than a general contractor self-performs them. On most jobs your employer is one of these:
-
Interior systems contractors. The core of the trade. These are the firms that take on steel-stud framing, drywall, and acoustic ceilings as a single package, often with insulation and firestopping bundled in. They range from a small crew doing basements and small offices to large shops running dozens of boarders and tapers across several ICI sites at once. This is the group that shows up on the big fit-out and institutional awards, and the one to watch on the feed.
-
Drywall and taping subcontractors. Finishing-focused shops that specialize in taping, mudding, sanding, and high-level finishes. Some do board and finish both; many do finishing only and hire tapers hard the moment they win a block of work.
-
General contractors and construction managers on projects where they carry an interior crew directly, or where they run the same preferred drywall sub job after job. When a GC wins a build, the interior scope gets bought out shortly after.
-
Homebuilders and residential drywall subs on subdivisions, custom homes, and low-rise condos. High volume, fast turnover, lots of repetition, and the easiest lane to get into as an apprentice.
-
Restoration firms handling fire, flood, and water damage. They tear out and rebuild walls and ceilings on insurance timelines, so their work is steady and far less tied to the construction cycle.
-
Ceiling specialists doing suspended T-bar grid, acoustic tile, and specialty ceilings, sometimes as their own scope on larger commercial jobs. This is a natural home for a boarder who likes ceiling work.
On the feed, the two signals to watch are permits (a builder or owner pulled a permit, so the interior scope, including board and finish, is coming) and awards (an interior systems contractor or a general contractor just won a job that will need a drywall crew).
The kinds of drywall and finishing work
Boarding and finishing are distinct skills done by distinct crews, and where you land shapes your pace, your pay, and your ticket path. The main lanes:
-
Boarding (451A). The hanging side of the trade. Laying out and framing steel-stud partitions, standing walls, hanging drywall on walls and ceilings, and building bulkheads, soffits, and shafts. It also covers acoustic and T-bar ceilings (suspended grid and tile) and lathing, the base for plaster. Heavier, faster-moving work, often on stilts or a lift, and it sets the pace for everything that follows.
-
Taping and finishing (453A). The finishing side. Taping the joints, applying and sanding the mud in successive coats, and working to a specified level of finish. Clean, patient, detail-driven work where the quality shows through the paint under raking light.
-
Levels of finish. Commercial specs call out a level from 0 to 5, and knowing them is table stakes on ICI work. Level 1 is a taped joint in unseen spaces, Level 2 is a skim over tape for areas behind cabinets or in service rooms, Level 4 is the common finish for flat paint and light textures, and Level 5 is a full skim coat for gloss paint and critical lighting. Being able to hit a spec'd Level 5 is what separates a good taper from a great one.
-
Machine and hand finishing. Volume jobs run automatic taping tools (bazooka, boxes, and an angle head) to move fast; smaller and detail jobs get taped by hand with a banjo and knives. Most tapers do both, and the automatic-tool skill is worth building because it is what fit-out shops need when the schedule is tight.
-
Plastering. Traditional and veneer plaster over a lathing or blueboard base, plus patch and restoration work on older buildings. A narrower lane than board and tape, but skilled plasterers are harder to find, and the restoration and heritage side keeps steady demand in the older parts of the province.
-
ICI (industrial, commercial, institutional). Offices, schools, hospitals, retail fit-outs, and institutional builds. Bigger projects, tighter spec, more paperwork, fire-rated and acoustic assemblies, and generally the best rates. Frequently unionized.
-
Residential. New houses, low-rise condos, basements, and renovations. Smaller crews, a faster pace, piecework in places, and the most accessible way in for a new apprentice.
When drywall gets the call on a build
Reading the build sequence is how you time your outreach. Drywall is mid-to-late interior work, and it lands in a specific order:
-
Boarding comes first, but only after the walls are ready to close. That means rough-in for electrical, plumbing, and HVAC is done and inspected, and insulation and vapour barrier are in. Boarders frame any remaining steel stud, then hang the board on walls and ceilings.
-
Taping and finishing follows the board, joint by joint, coat by coat, with sanding between coats and a final sand to the specified level of finish. On a big floor plate this can run for weeks after the boarders move on to the next area.
-
Then paint, once the finish is signed off. Painters cannot start until the tapers are clear, so the finishing crew often sets the schedule for the back half of the interior.
So a fresh building permit signals that boarders and tapers will be needed roughly a couple of months out, depending on how fast the project frames, closes in, and gets its rough-in inspections done. Treat any specific timing on the feed as an estimate, not a promise.
Fit-out and renovation work behaves differently. The walls and services are often already there, so board and finish can land much sooner, and this work is steady and far less tied to the permit cycle. It is a reliable way to stay busy between new-build starts.
An ICI award means the interior systems sub gets engaged at buyout and mobilizes on the project schedule, which can be weeks or months after the announcement. The award tells you who to watch; the mobilization date tells you when to call.
On AEC Stack: The live strip at the top of this page is the real thing. It reads building permits and awarded contracts from across Ontario as the records land, so you can see which builders and interior contractors are staffing up right now, the trades they need, and the timing window for each. Where we have verified a phone number or website, it is on the card. Set up a free weekly alert and we will email you when finishing work shows up near you. First name and email only, no account.
Where the work is right now
Drywall and plastering are interior trades, so they run steadier through the winter than exterior work like roofing or masonry. New-build volume still tracks the construction season and the permit cycle, but commercial fit-out, restoration, and renovation carry through the cold months and keep boarders and tapers busy year-round.
Geographically, the deepest pools are the GTA and Ottawa, where the office, retail, and institutional fit-out markets are largest, plus residential completion across the growth corridors around Waterloo Region, Barrie and Simcoe County, Durham, and Hamilton and Niagara. Where a lot of housing is finishing at once, boarders and tapers are in demand right behind the framers and the mechanical trades. Fit-out and tenant-improvement work concentrates in the downtown and suburban office markets, and it turns over faster than new construction, so it is worth watching even in a slow build year.
How to get in front of these employers
The feed gives you the who. Here is how you turn that into work:
-
Reach out directly. Once you have the employer name and location from a card, look them up and contact them off the card. Lead with your ticket, 451A or 453A, and say plainly which side you work: board or finish. Interior systems contractors run separate boarding and finishing crews, so telling them exactly what you do gets you to the right foreman faster.
-
Bring the site tickets up front. If you are an apprentice, state your level and your logged hours. Then name the certs that get you on site: WHMIS, Working at Heights, and any first-aid. Say whether you are comfortable on stilts and on a scissor or boom lift, because ceiling and high-wall work leans on both, and a foreman wants to know before you show up.
-
Name the skill you bring. A taper who can run automatic tools or hit a spec'd Level 5, or a boarder who is quick and clean on steel stud and ceilings, is worth saying so. Specialties like veneer plaster or restoration are worth flagging too, because the shops that need them cannot always find them.
-
Work the union hall if you are organized. Interior systems and drywall trades in Ontario are represented by locals of the Carpenters' union and, on the finishing side, the Painters' union (IUPAT), depending on the shop and the region. Get your name on the out-of-work list, stay in contact with your business rep, and let the hall dispatch you to signatory interior contractors.
-
Go direct for residential and restoration. Those shops hire faster and with less process than the big ICI firms, and they are almost always short-handed. A builder finishing a block of houses or a restoration company with a backlog is exactly when they are registering apprentices and adding tapers.
-
Time it to the signal. An employer who just pulled a permit or won a fit-out is staffing for that specific job. Interior systems contractors crew up quickly once they win the work, so reaching out in that window, before the boarding and finishing crews fill, is the whole point of watching the feed.
Getting qualified
If you are still chasing the 451A or the 453A Certificate of Qualification, that ticket is what moves you from helper to journeyperson and opens the better-paid ICI and specialty finishing work. Our Last Mile to Certificate of Qualification guides below walk the hours, the exam, and the union path for both the boarder and the finisher tickets, written from the apprentice's seat so you know exactly what each step asks of you.
Get qualified for this work
Our Last Mile to Certificate of Qualification guides cover the exam, licensing and union path for every trade in this family.
451A Drywall, Acoustic & Lathing
C of Q exam prep for steel-stud framing, drywall installation, acoustic ceilings, exterior sheathing, and fire-rated assemblies — plus manufacturer certifications, the 453A finisher dual-credential path, and CDCO union dispatch.
453A Drywall Finisher & Plasterer
C of Q exam prep for taping, joint compound, plaster, and heritage restoration, plus GA-214 levels of finish, the 451A + 453A small-shop ownership combo, manufacturer certifications, and CDCO / OPCMIA union pathways.
Get a weekly heads-up
We will email you when drywall & plaster employers near you start hiring. No account, first name and email only.