Try this on a real business
Open a seeded business in your trade. Nine jobs on the pipeline, a quote sent and viewed, a deposit paid, and an invoice already overdue.
Open the demo businessNo card, no form. Sign in later and everything you built stays on the same account.
$111 and one week of classroom buys work the landscaper next door cannot legally touch
If you went looking for this license at TDLR, you found nothing, and there is nothing there to find. Landscape irrigation in Texas is licensed by the Texas Commission on Environmental Quality. The water agency, not the trades agency. Start at the right desk and the whole thing is a course, an exam and a fee.
TCEQ issues all three credentials: Licensed Irrigator, Irrigation Technician and Irrigation Inspector. The statute is Occupations Code Ch.1903, the rules sit in 30 TAC ch.30 subchapter D and 30 TAC ch.344, and TCEQ publishes the whole rule set in one booklet, RG-470, so the trade you are buying into fits in a single PDF.
Now the part worth your afternoon. Texas does not license landscaping. There is no state contractor license to mow, plant, edge, lay sod, build beds or set stone, the same way there is none for framing, painting, concrete, drywall or roofing. Sprinklers are the exception. Under 30 TAC 344.30, irrigation services in Texas belong to a licensed irrigator: selling, designing, installing, maintaining, altering, repairing and servicing a system, and above all connecting one to a water supply.
That sentence is a fence around a market, and $111 puts you on the inside of it.
The three credentials, and what each one lets you sell
| Credential | What it lets you do | How you qualify | Fee | Term | CE per term |
|---|---|---|---|---|---|
| Licensed Irrigator (LI) | Sell, design, consult, install, maintain, alter, repair or service an irrigation system, including connecting it to a private or public water supply | Basic irrigator course, 40 hours, then the exam at 70 percent on each section | $111 | 3 years | 24 hours |
| Irrigation Technician (IT) | Connect a system to a water supply, and install, maintain, alter, repair or service one under a licensed irrigator | Technician course, 16 hours, then the exam | $111 | 3 years | 16 hours |
| Irrigation Inspector (II) | Inspect systems and enforce a city's irrigation ordinance or a water district's rules, usually on the city's behalf | Basic irrigation course, plus a backflow prevention testing course, plus a water conservation or water audit course, then the exam | $111 | 3 years | 24 hours |
Read the qualifying column again, because of what is not in it. TCEQ prints the reason in two lines on its own licensing page, for all three credentials: no education required, no work experience required. A course, an exam and $111.
Forty hours against eight thousand
Set that against the rest of the licensed Texas trades, using the boards' own numbers.
| Credential | What it takes to hold it | Renewal | CE |
|---|---|---|---|
| Licensed irrigator, TCEQ | 40 classroom hours, no experience requirement | Every 3 years, $111 | 24 hours per term |
| Journeyman electrician, TDLR | 8,000 hours on the job under a master electrician | Annual | 4 hours a year |
| Master electrician, TDLR | 12,000 hours, plus two years holding a journeyman license | Annual | 4 hours a year |
| Journeyman plumber, TSBPE | 8,000 hours under a licensed plumber, plus 48 classroom hours | Annual | 6 hours a year |
| Air conditioning contractor, TDLR | Class A for any size system, Class B up to 25 tons, by endorsement | Annual | 8 hours a year, one of them Texas law and rules |
| Roofing | No state license exists | Nothing to renew | None |
The electrician and the plumber rows are four year commitments to somebody else's payroll before the license is yours to hold. Irrigation asks for a week in a room and an exam booking, and the credential that comes out the other side is the one that lets you sell the work, not only perform it.
Three years at $111 is $37 a year. Be straight about the classroom hours, because they are comparable: 24 hours across an irrigator's three year term, against 18 for a plumber and 12 for an electrician over the same three years. The gap is not study time. It is filings. One renewal against three, one fee against three, on a credential you can hold from a standing start.
Same yard, same truck, different legal right
A landscape crew can do most of a residential exterior. Beds, sod, trees, stone, drainage, lighting, fence. The moment the scope includes a sprinkler system, and above all the moment anything touches the water supply, that portion of the work belongs to a licensed irrigator.
This is the inversion that makes irrigation worth writing a page about. In an unregulated trade you compete with the whole phone book. Here, the state has already removed the phone book from the bid. Your license is not a hurdle you cleared alongside your competitors, it is the reason they are not on the list.
What that buys you in practice:
You bid the whole yard. A landscaper who cannot install the system either drops the irrigation line out of the quote or brings somebody in. A licensed irrigator quotes both halves and keeps the margin on both.
You become the call the landscaper has to make. Any landscaping outfit in your county that hits an irrigation scope needs a licensed name on the contract. Being that name for four crews is a book of work that arrives without marketing.
Builders come looking. TCEQ prints three separate leaflets telling people to hire a licensed irrigator: GI-632a for homeowners, GI-632b for property managers, GI-632c for builders and construction companies. The state is running demand generation for your credential, at its own expense, and segmenting the audience while it does it.
If you want the wider picture of which Texas trades carry a state license at all and which are governed by city hall instead, that is do you need a contractor license in Texas.
What you hand the customer is a product, not a favor
Chapter 344 loads the licensed irrigator with duties. Read them as a rate card rather than a rule list, because each one is a thing you are entitled to charge for and an unlicensed competitor is not.
A sealed design. Under 30 TAC 344.61 you prepare a site-specific irrigation plan for each new system. Drawn to scale, with a north arrow, a legend, zone flow measurements, controller and sensor locations, component specifications and design pressure, carrying your seal, your signature and the date. The plan has to be on the job site during installation and has to be consulted there. Texas gave you a seal, which is a thing engineers and surveyors have. A design that carries a seal is a design fee, and it is a deliverable the customer keeps even if somebody else installs.
A licensed body on the ground. 30 TAC 344.62 puts a licensed irrigator or licensed irrigation technician on site at all times while the system is being installed. Your crew digs and glues, your license supervises, and that supervision is why your hour is priced differently to a laborer's hour.
A written warranty. 30 TAC 344.72 requires a written warranty on materials and labor for every new installation, carrying your name, business address and phone number, and signed by the owner to confirm they received it. A written warranty is the opening line of a service agreement, and service agreements are the difference between a lumpy install business and a business with a monthly number.
A closeout the customer keeps. 30 TAC 344.63 has the licensed person who supervised the job walk the owner through it and hand over a maintenance checklist, the manufacturer's manual, a seasonal watering schedule, the irrigation plan and as-built, and a permanent waterproof sticker for the controller. That sticker puts your name on the wall of the garage, next to the controller, where the homeowner looks the next time a zone fails.
Your letterhead, written into the deal by the state. Under 30 TAC 344.71 every contract to install a system is in writing, signed by each party, and carries your name, your license number, your business address, your business telephone numbers, the date each party signed, the total agreed price, the TCEQ contact block, and your seal. When a builder or a landscaper subcontracts irrigation to you, the rules put your details in front of the homeowner rather than the builder's. That is where the repeat service calls come from.
The city permit is the second half of the job
Texas Local Government Code s.551.006 tells any municipality of 20,000 or more to adopt an ordinance requiring the installer of an irrigation system to hold the state license under Occupations Code s.1903.251 and to obtain a permit before installing, inside the city limits and out in the extraterritorial jurisdiction. The ordinance carries minimum design, installation and operating standards under Occupations Code s.1903.053 and the TCEQ rules, the city may charge a permit fee set to cover its own administration, and the city may employ or contract a licensed plumbing inspector or a licensed irrigation inspector to enforce it.
Read that as demand rather than as red tape. The ordinance is a condition your unlicensed competitor cannot satisfy at any price, written into local law in every Texas city of 20,000 or more.
On top of the permit sits the city's contractor registration, which is the front door to pulling permits at all.
| City | What an irrigation contractor does | Cost |
|---|---|---|
| Austin | Free registration in the Austin Build and Connect portal before any permit; trade contractors hold the state license | $0 |
| Houston | No general contractor registration; state-licensed trades register with the permitting center, and a permit may be bought by the owner, agent or contractor | $0 |
| Dallas | Register with Building Inspection through the city portal before pulling a permit or booking an inspection, with proof of an established place of business and a named responsible party | $120 per year, $30 to change the record |
| Fort Worth | Registration before permits, on the city's own fee schedule, in a combined Building and Plumbing-Irrigator band | $168.75 per year, $60 to change the registered official |
| San Antonio | Home Improvement Contractor registration for residential work, with an FBI national background check | $150 per two years |
San Antonio also wants the certificate of insurance filed with the registration: $300,000 per occurrence, $600,000 aggregate, $300,000 products and completed operations, with the City of San Antonio named as certificate holder. Order the certificate in those numbers and it will clear the other four cities as well.
That Fort Worth line is the one to notice. The city files irrigators in the same registration band as plumbers, at plumbing rates, which tells you how the permit desk sees the work: a connection to the potable supply. The whole of chapter 344 lives at an environmental agency for that reason, and it is also why backflow prevention runs through everything. TCEQ's own route to the irrigation inspector license runs through a backflow prevention testing course, which is a fair indication of how close the two sit and where a second revenue line lives once your irrigator license is in hand.
The city-by-city detail, including which portals move in a day and which want you in person, is Texas city contractor registration.
Eight hours a year, one filing every three
The renewal is the same $111 as the application. Before the license expires you bank the continuing education: 24 hours for an irrigator, 16 for a technician, 24 for an inspector, done before you renew rather than caught up after.
Twenty four hours across three years is eight hours a year. One day, once a year, and the renewal is already paid for in study.
Every other Texas construction board in this guide renews annually. Irrigation renews once every three years, which makes it the lightest piece of admin on the truck and the one date that will not come round with the calendar to remind you. Park it on the same reminder as your insurance certificate and your city registration, and the three of them come up together and get dealt with in one sitting. Which certificates a Texas customer or general contractor asks for, and when they lapse, is contractor insurance certificates in Texas.
Build the shop around one license and cheap seats beside it
The two operating credentials are designed to stack. The irrigator sells, designs and seals. The technician connects to the water supply and installs under that irrigator's supervision.
For a growing shop that shape is unusually kind. Your second and third hires do not need four years of hours before they are useful on a permitted job. They need a 16 hour course, an exam and $111. You stay the license that carries the business, and the crew around you is qualified to do the part of the work the rules restrict.
That is the difference between hiring on a four year apprenticeship clock and hiring on a two day course, and it is the reason a one van irrigation business can add vans faster than a plumbing shop can.
The order that actually works
Book the basic irrigator course first. Everything downstream waits on those 40 hours, so the course date is your start date.
File with TCEQ while the course is fresh. Application and $111, with no experience record to assemble, because TCEQ asks for none.
Sit the exam and clear 70 percent on each section. Section-level scoring means an even study pass beats cramming one topic.
Order your seal the week you are licensed. Your plans and your install contracts both carry it, so the seal is what turns the license into invoiceable paper.
Register with the city where your first permit is going to be pulled. Austin and Houston cost nothing, Dallas and Fort Worth cost money, San Antonio runs an FBI background check and is the one to start early.
Get the certificate of insurance before you quote. Builders and property managers ask for it in the same breath as your license number, and San Antonio wants it on file to register you at all.
Then quote whole yards, not sprinkler zones. You now hold the piece of the job the competition cannot sell.
What this costs on AEC Stack
Your license expiry, your CE hours, your city registrations, your insurance certificates, your quotes and your invoices sit in one place. There is no monthly subscription. AEC Stack takes 2.5% of each invoice processed through the platform, collected on the payment due date, so the platform gets paid when you do.
On AEC Stack: setting the company up around the license is start a construction business in Texas, and the city front door is Texas city contractor registration.
Book the course, then build the business around the seal. The company side, entity, registrations and insurance, starts at start your business, and the Texas site work going out to bid right now is on find work.
Keep going
Where this happens on AEC Stack
Set the business upIncorporation, CRA accounts, WSIB, trade licensing and insurance, in order, tracked to done.The dates that cost Texas contractors money
One email a month. The lien deadline and prompt payment arithmetic this site already does for you, the dates it turns on, and every new guide the day it goes up.
- Texas lien deadline calculator: The 15th-of-the-month arithmetic, done. Monthly fund-trapping notices and the affidavit deadline, commercial or residential.
- Texas prompt payment calculator: When the money was legally due under chapter 28, counted the whole way down: the owner period plus the pass-through to you.
- Every new guide the day it goes up. 38 are live for Texas right now, the most recent being "What an hour costs you in Texas" on 20 August 2026.