Retention on California jobs

California caps retention on public work and puts a clock on releasing it, and the private side runs under a payment statute most subcontractors never invoke. These guides cover what can be held, when it has to come back, and what a late release costs the party sitting on it.

Click through it first

Registration, tax, licensing and insurance in one tracked run. Open a business that is already through it and see where every document lands.

Open the demo business

No card, no form. Sign in later and everything you built stays on the same account.

14 guides on this

After you qualifyCaltrans and public works bidsHow a bid item price is deemed full compensation, why final pay quantities are never remeasured, the 25 percent quantity swing, working days charged against the controlling activity, 5 percent retention and release 60 days after completion.Before you qualifyC-7 Low voltage systemsWhere low voltage stops and C-10 line voltage starts, why a fire alarm deferred submittal decides your start date, and how finishing last pushes retention to 45 days after completion under Civ. Code s.8812 with 10 days to pass it down.Before you qualifyC-9 Drywall and taping licenseThe burdened hour and the retention clock: 7 days for the prime to pay you under BPC s.7108.5, 45 days for private retention plus 10 more down the chain, the $500 home improvement rules, and four years of certified experience.Before you qualifyC-11 Elevator and conveyance licenseSpecial inspections as a condition of permit, deferred submittals that sit on your critical path, the 45 plus 10 day retention chain, and a lien window that drops from 90 days to 30 once a Notice of Completion is recorded.Before you qualifyC-16 Fire protection licenseThe deferred submittal chain, special inspections as a permit condition, the DSA and HCAI review paths for schools and hospitals, and a lien window that can close four days before the owner has to release retention at 45 days.Before you qualifyC-29 MasonryRead the statement of special inspections before you price the block, because every continuous item puts an inspector on site while you grout. Covers the four dwelling seismic line, the $25,000 bond, two exams and 5 percent retention released 60 days after completion.Before you qualifyC-38 RefrigerationA $180,000 grocery subcontract at 10 percent retention parks $18,000, and it runs 55 days from your last day on site to your last dollar. Covers the 30 day lien window a recorded Notice of Completion leaves a sub, the indoor heat standard from 82 degrees and the $25,000 bond.Before you qualifyC-43 Sheet metalYou fabricate, so CDTFA Regulation 1521 deems a manufacturing profit into the cost price of every fixture that leaves your shop, and the contract wording decides the tax base before you ever bill. Covers the 136 days from buying coil to retention landing, the 150 percent withholding cap, and Chapter 7A envelope work inside the 100 foot defensible space.Before you qualifyC-50 Reinforcing steelAn $8,000 inspection item caps the withholding at $12,000 under BPC s.7108.5, and the other $34,000 of a $46,000 progress payment is due within 7 days of the prime being paid. Covers the purchased weight that never comes back as a change order, retention at 45 days, and a 90 day lien window cut to 30 by a recorded Notice of Completion.Before you qualifyHAZ Hazardous substance removalThe removal item is bid as its own line and the certification is the eligibility check on the bidder, which is why the list stays short. Costs 40 hours of initial training plus an 8 hour refresher a year under 8 CCR 5192, and pays on a public clock with 5 percent retention released 60 days after completion and no lien behind it.How to run the businessCSLB law and trade examsLaw and Business runs about 115 questions, the trade exam about 100, both closed book at PSI. The statute behind every subject, from the 20 day preliminary notice to the 45 day retention release, plus a $46,000 swing on one kitchen.How to run the businessLien releases and waiversThe four statutory forms at Civ. Code s.8132 to s.8138, the two questions that pick one, why an unconditional release binds even if the check never clears, and how retention at 45 days and 10 days changes the timing.How to run the businessRetention and release datesPrivate retention is released by the owner 45 days after completion under Civ. Code s.8812 and passed down within 10 days under s.8814. Includes the worked calendar where a subcontractor lien window closes two days before the money is even due.How to run the businessInvoicing and payment applicationsWhat each line on a California billing does: the license number under BPC s.7030.5, the jobsite address that sets the tax rate, retention as a deduction rather than a discount, and cumulative columns. Includes a $184,000 payment application that recovers a lost month.

Count it instead of estimating it

Every calculator

The rest of the California library